Monday, December 08, 2025

Boat Yard - Part 1 - Such a Long Haulout...

[Kyle]At the appointed hour, we tossed our lines to the Norsand staff and then were pulled slowly in position above their bespoke articulating trailer. Kevin was still there, expertly directing the whole process from underneath Begonia's bridgedeck, without any apparent regard for his level of dryness, making sure our boat was lifted at strong points by using very carefully placed blocks. I'm pretty sure Kevin designed most of the haulout equipment that Norsand has been using over the years. It all requires a team, lots more work than a Travelift, and just the right state of the tide for your draft. Ask Kevin when high tide is next month on the fifteenth and he can likely tell you without needing to look it up.

Our first day being hauled out is usually a pretty frustrating one. With a huge list of jobs in each of our heads, Maryanne and I are always eager to make the most of the time and get things started. Since she and I are not doing any of the actual work of operating the haulout machinery, it feels like we are relegated to not being able to do much other than pace back and forth in the sun and slowly walk behind Begonia as she is moved to her spot on the pad, while trying our best not to appear to be looming. Add in lunchtime and breaks for the staff and soon the end of the day is nearing and we have barely pulled out any tools yet. Sitting down to dinner, we're still basically on the same boat, which we both agree is overdue for this particular haulout, with our only evidence of progress being the view of the adjacent boats filling the windows. It seems lees like scenery than a grim reminder of what's to come.


It starts with actually getting removed from the water, pressure washed before being moved and safely blocked in our new home location

Day Two and beyond was different. My plan from here on in was to wake up in the dark. That way, coffee, breakfast, and a brief conference about the day's impending work could all be completed by the time it started getting light enough out to see what we were doing.

As usual, Maryanne served as our Project Manager, while I would occasionally add input about one thing or another, and then go about doing the next job that needed doing on my end while she set to doing hers. At the end of each day, I was pretty adamant about tidying up enough for us to at least be able to find the now widely-scattered tools the next morning, and to have a few minutes of normal civility over dinner before another too-short night of sleep. Then we would repeat of the same pattern the next day. As I was going about my tasks, when I reasoned that I had just enough energy in me for the above, I would opt to do "just one more thing" before finally finding Maryanne and begging her do finish her one more thing before it gets too dark.

Maryanne, in her initial e-mails back and forth to the yard and the various contractors, estimated that we would need to be hauled out for about three weeks. That seemed to me to be a bit optimistic (I think she was secretly hoping to be back in the water before the holidays), but we still ended up being on the hard way longer than I had expected.

This particular haulout ended up being especially rough for us for a few reasons. Firstly, we had both finally decided to stop putting off so many of the non-structural, non-safety, cosmetic items that always seemed to never make it to the top of our list on previous haulouts beneath stuff that was clearly more important.

This made for more work in general this time, but it also made for a different type of work. Painting the bottom or replacing the rigging or even fixing an engine can always be done "over there". If it's the engine under our bed, we'll just switch berths for a few days until we can move back to our familiar space.

This time, however, in addition to all that normal stuff, we are also doing things like replacing the flooring, painting interior walls, and replacing the surface wood on our main bulkhead. This means there is no place left on the boat that is not a work site. Eating dinner off a drop cloth in a room that has been tented off with plastic sheeting to keep the dust down, it is hard to feel like the end of the tunnel was in sight.


It felt very much like we were living in a construction site for much of our time, with ceilings, flooring and even some walls removed or being worked upon

Then came the yard. As usual, Maryanne was very proactive in sending out e-mails to book all the work we currently needed help with as far in advance as possible. She would then send follow-ups and more follow ups to make sure the right workers would be available when we were there.

We have previously said many glowing things about Norsand, and I think most of that still applies. The problem this year seems to be the basic economic problem of too much demand for the supply. There were a lot of boats hauled out this year, and they were all hoping for the yard to do some or all the work for them. Mark, the yard manager from before, who we could not perturb, has now moved on. The new guy has a lot of experience and is a fount of useful information about how to do work outside our skill sets. He does, however, seem to not like saying no. He will say yes to everything anybody wants. That's how the yard makes its money, of course. The problem is that he will say yes to two thousand hours of work for a period when there is only enough staff to do eight hundred. This has the effect of making everyone unhappy as they wait for their turn for the laborers to begin (whist having to pay for many extra yard days), long after they had been told the work would be complete already.

It was the same for us. Despite having made an appointment long ago for our particular yard time, it was almost three weeks before we could finally get someone to come aboard and have a look at what we wanted from those bonus jobs. By then, Maryanne had originally been hoping to at least be getting ready to be going back in the water. We were given plenty of attention and promises that, since it was Friday, work would begin on Monday, maybe Tuesday...

All the while, Maryanne and I had been holding off on a lot of our own work until their work was done. Some things just have to be done in a specific order. You can't repair an item without the parts. You can't test a repair until it has been completed. You can't have somone working on a room while you remove the flooring, It's not a good idea to remove tank valves until the tank is empty, etc. We still had a lot to do, but we were running out of stuff we could do before the other work started.

Then Begonia made it to the top of the list. Suddenly, we had tradies stepping on each other's toes to get to their respective parts of our boat, while Maryanne and I did the same in ours.

After a few days of this, I couldn't help but notice unusual periods of quiet. That's when I realized Maryanne and I are not subject to the same labor laws. Thirteen-hour days with no lunch, no break, and not even enough time to use the bathroom would be patently illegal for the guys scraping off Begonia's bottom paint. On Friday afternoons when they all gathered up their stuff and started heading for the exit, I couldn't help but envy them a little (just a little). C'mon! There's still four hours of daylight left!

Of course, it also didn't help that nothing, absolutely nothing, went to plan. Every single job on our list had some complication or another come up that made it take way longer than it should have. Take the item, "Replace the Windlass" Our windlass is great, but it has one major design flaw: it is secured to the boat with stainless steel studs threaded into the aluminum body. Since they are dissimilar metals, this causes the body to eventually corrode away until the thing falls off. The consensus amongst the experts is that the design of the mounting gasket, which causes it to sit in a pool of salt water, isn't helping. Unfortunately, this particular make and model of windlass is one of the very few that will fit in Begonia's mounting space, so we have little choice but to replace it.

Or do we?

We did that the first time, back in 2018. Windlasses are expensive, like more than my first three cars, combined. This time we were told that they are a lot more now, particularly if shipped all the way to New Zealand. Groan.

Maryanne did some digging and found out that we could replace only the corroded body part AND we could actually get it to New Zealand in time, for less than half the cost. That means that the task was now to completely disassemble the windlass (think lots of gears and little springs that go zinging by your ear never to be seen again), change the part, and then reassemble the windlass. Oh, yeah, and then install the newly-repaired windlass.

One of the sub-jobs of the main task was: "Remove the four bolts holding the plate on to gain access to the innards of the windlass for further disassembly." I know for sure, because I am the original owner, that these bolts have not been touched since we installed the new (and used lashings of treatments designed to prevent corrosion).


Our windlass had failed (again) despite all sorts of treatments and regular fresh water rinsing. Replacing the corroded case required a full rebuild and a LOT of unexpected effort

They were really in there. I stripped all four bolt heads trying to remove them. This required them to be drilled out. We did have the right sized drill bit, but it was composed of metal barely harder than the bolts themselves. Getting the right one required a bike trip to the nearest tool store to buy a carbide bit. They were out of that size, so I had to keep riding to store after store until finding it on the far side of town. In this way, "remove four bolts" turned into an all-afternoon affair. After returning home, I ended up only having enough daylight to remove three of them. Thus, after a whole long, frustrating day, I had exactly zero items I could cross off our Jobs List. My average is going to have to be higher than that.

Everything we did, every single thing, had something like that go wrong that turned it into a huge ordeal. Every time one of us would try to knock out an easy item, just so we could say we got something done, the part wouldn't fit or a bolt would strip or we would end up spending an entire morning tearing apart the already-torn-apart boat, looking for the one lost tool that can do the job. When we couldn't find it, we would have no choice but to stop what we were doing and make a trip to the store to buy a replacement.

Then there were the tradies. They tended to inadvertently make things worse by saying things like, "Just get everything ready and I'll be over tomorrow morning to start the work". What we were now doing was cancelled because we didn't want to be the reason a particular job doesn't get started, especially when it could mean Begonia needs to do another slow climb from the bottom of Norsand's priority list again.

Our very worst day in the yard came when Trevor, the outside contractor who we hired to install the new flooring, told us to, "Remove the old flooring and clean the surface. I'll be by tomorrow to installing the floor in the main cabin.".

Maryanne and I had originally toyed with the idea of installing the new vinyl flooring ourselves. With a suggestion from Jeff (more on him later) we saught out an expert to help. After talking to a few professionals, including one company who wanted several thousand dollars to do the job for ten square meters of floor area, and they convinced us that the job is quite frankly beyond the ability of amateurs with normal tools. In hindsight, they were right. We would have TOTALLY screwed up the job if we had done it (especially the large patch of flooring in the main cabin, the one that everyone gets to see first!). We didn't like the estimates, though, so Maryanne started searching for more frugal options.

That's how we found Trevor, a retired vinyl installer with forty years of experience who picks up odd jobs to keep himself busy. (Installing flooring?) His estimate was under a thousand dollars (whew). We winced and agreed to let him do it.

Unfortunately, he was planning on leaving town to be with family over the holidays, so if we wanted him to do the job, our choice was pretty much: right now. We originally wanted to do this job closer to last in order to avoid too much time tracking yard grime all over our pristine new floor. Plan B became: Hide the new floor under drop cloths for a month or so until the yard work is done.

Which brings us back to, "Remove the old flooring." Based on some test removals at a few of the peeling corners and our steps, Maryanne and I had mistakenly thought the job wouldn't be too bad. When Trevor dropped this one on us, it was midday and we were both really busy with other things. We decided to rearrange our tasks to allow an hour or two at the end of the day for removing our old flooring.

Anyone who has ever dealt with the contact glue used to apply flooring knows what's coming next. The corners Maryanne and I peeled up had been exposed to decades worth of grime, spills, moisture and salt, which significantly weakened the glue's bond. The stuff in the middle was in a pristine, hermetically sealed environment. That glue was ridiculously, unnecessarily strong. Had we been able to get a good enough grip on the vinyl, we could have easily lifted the whole boat with it. We probably could have filled the boat with water and still lifted it. What the hell is that stuff?


Removing the old vinyl (from both wood and gelcoat bases) was easy on the small matches, but quite a bit tougher on the larger areas, and then there was the cleaning and prep before the new flooring could be laid

Fortunately for us, Trevor left behind his heat gun for us to use in case we needed it. Did we ever! Heat guns of this type are like super hair dryers that are half a step below a blow torch for putting out heat. Contact glue weakens with heat, so the idea is to heat the old flooring until you can barely stand to touch it, then grab a big (gloved) handful and start yanking while someone else goes at the edge with a sharp scraper.

Alternating duties and using every muscle to pull as hard as we could, we were able to pull up about a centimeter per exhausting try. Three hours in, we were both completely spent, we were only about halfway done, darkness was falling, and we knew Trevor would be here in... what is it? ...nine hours, to begin installing the replacement floor. We had no choice but to keep going. Afterward, we didn't even get relief from going to bed for a while because we were both too sore to sleep from muscle aches, bruises, and burns. Even though we later agreed that was our worst day, several others came close.

When Trevor finally finished the installation two days later, we both agreed it was beautiful. It has to be. We are NEVER doing that again! Then we covered it up to enjoy later in some distant, unseen future.

It was about then that the yard's guys started showing up in earnest. Of course they did. With the flooring in progress, the only way to get from one part of the boat to another was by climbing through the hatches. Three guys showed up to start the grueling work of stripping the antifouling back to bare gelcoat. Then Premek arrived to do fiberglass repair on damage hull caused by the starboard rudder blade when we hit a submerged tree in the ICW over a year ago.

Dislike is probably a bit too strong a phrase, but early on, we decided we didn't care for Premek.

Don't get me wrong. Premek is a very nice guy. He also has very high standards for his work and he will not be rushed. He also seems to prefer chatting to being encased in full protective gear grinding away or working with toxic chemicals. To be fair, his job requires a lot of waiting for resin to cure between coats, and you really don't want to rush that part, but still, the yard charges ninety bucks an hour for his time and it's really hard not to keep a little taxi meter running total going in our heads.

When he finished the job, as well as a couple of other minor ones, his work was so good that we literally can't find the repairs anymore. Okay, we'll give him that, but when his time with Begonia was over, I think we were all glad we wouldn't be seeing each other so much anymore.

When the yard told us their main woodworking guy wasn't available to replace our bulkhead panel, which was probably the most major job on our list, and that they were going to be sending Premek over on Monday, Maryanne and I looked at each other and both let out a collective groan. Not Premek...

When he showed up, he didn't help matters. I think he may have been a little annoyed at having just been reassigned back to us only a few minutes earlier for what looked like was going to be the foreseeable future. He took one look at the wall and then seemed distraught almost to the point of tears at how difficult the task before him was. He kept talking about how it was going to take him WEEKS at the least to do the work. This will cost THOUSANDS! The wall is not flat. The wall is not straight. We are going to have to start MAJOR modifications to make this work, etc.

Maryanne took Premek by the shoulders, looked him in the eye and said, "Premek, the wall was never flat. We don't want it to be flat. We don't NEED it to be flat. All we want to do is replace the bad surface wood with another piece so that it looks better than it does now."

Premek is a perfectionist, he went away to do some thinking...

While he was gone, two things seemed to have happened. The first was that he came up with a pretty good plan for the repair. This improved his mood considerably.

The second thing seemed to be a change in his take on us. Apparently, he deals with a lot of entitled yachties who want great work done and they want it done yesterday. Uh, yeah. I guess we may have been doing a little bit of that. Once he realized that our surname wasn't Moneybags, and that we didn't need perfect work, just the most economically feasible pretty good work, he could not have been more helpful.

This is when I realized that the value of Premek's hourly rate was not so much in his labor (which, again, is very good), but in his knowledge. To help save us some unnecessary cost, he taught us how to do everything but the hardest, fiddliest parts of his job. He would ask to see our tools, look at them, and then tell us why they weren't exactly the best ones to use for a task. Then he would come back after his shift with his own better tools, teach us how to use them, and then lend them to us for the night so we could have a good practice. Then he would say things like, "Remove that wall. I'll be back in the morning to start putting in the new one." Premek!!!!

It was always a huge compliment when, having assigned us some homework, he would return the next morning, declare it a "good job," and then carry on with the next step himself without surreptitiously 'fixing' our portion first.

The yard staff once told Maryanne that Premek had after working on the NZ team race boat for urgent repairs, was offered and turned down a job with Porche (the high end car company), saying he would rather work at Norsand because there is more variety and he likes helping people.

I don't doubt it. After dealing with him some more, I completely changed my mind about him and his rate. I suspect that if you lived down the street from him, Premek would happily spend the whole day fixing your house for no other payment then a cold drink at the end and the smile on your face. A guy like that really does deserve to be able to make a good living for his skills. Even though it would have cost us a little more, I think we would have both been happy to have the yard assign Premek to do everything on their portion of our list.

Unfortunately, we were not so lucky. As I said before, the yard was struggling to provide enough labor to meet the demands of all the boats that were hauled out at a given time. Because of this, everyone, including us, had pared down our lists of work requested from the yard to only the bare essentials, leaving the remainder to figure out ourselves.

[Maryanne]We worked long hours every day, and mostly cooked at home in the evenings too, it was exhausting. Thankfully there were a few distractions that Maryanne insisted on. Fistly was an OCC (Ocean Cruising Club) dinner for the arriving boats held at a local Indian restaurant, secondly the local marine industry put on a welcome event one evening, complete with a proper Maori welcome and full show of songs and traditional Maori dance.


Welcome distractions from the general mistery of hard-labor in the yard


The yard cats are a joy for us to fuss over, unfortunately Ben (who was a fixture aboard Begonia the previous time we'd hauled out here) was friendly until he wasn't any longer and managed to bite Kyle's hand (down to the bone), which soon showed a serious infection and required a visit to the local medical clinic and some serious antibiotics.

[Kyle]As various jobs progressed, it wasn't uncommon to have new, previously unknown things come up that would now have to be added to the list. Some were minor. Others were not. For the most part, we tried to avoid involving the yard to keep the problem from getting worse for everybody. The yard manager was always overtly willing to help, but it was hard not to notice the subtlest cringe when we apologized for adding something new, and relief when we told them to remove one of our items from their list.

One of the jobs we still wanted professional help with, but could not get any firm commitments from the yard to do, was to add some shelves in various parts of the boat. After years and years of never operating any of our cabin doors, we finally decided to remove them altogether. The problem was that we have been using the space behind them (they are generally secured in the open position against a wall) as a fairly crappy ad hoc storage to put things we can't find another home for. Maryanne got the idea that we could put shelves in those spaces. That would give us better organized storage and make the space easier to transit, since the shelving would encroach on the area less than the doors had previously. Also, our doors are heavy, high-quality wood. She was fairly confident the weight of each set of shelving would end up being about half that of the former door it replaces, so Begonia could lose a little weight in general.

To this end, Maryanne found a local tradie – another retiree with years of experience in the field – who took a look at Begonia and agreed to start work the next week.

There is a sign outside Norsand's office that says, "Contractors must check in with the office." To this end, the day before he was supposed to come, our guy called Murray, Norsand's owner and founder, to check in.

Murray wasn't having it. We had been allowed to use Trevor to replace our flooring because Norsand doesn't have a department that does that, so we weren't stepping on anybody's toes. They do, however, do antifouling, joinery, and fiberglass work, as well as a few other specialties. Our joinery guy called us with apologies saying that Murray had told him unequivocally that Norsand was a closed yard and that he was NOT welcome to work on Begonia.

This caused a bit of a kerfuffle. Murray has stepped back a bit from day-to-day operation of the boatyard, so he is technically not in charge, but he's there all day, every day, and he does own the place.

He came to Maryanne and asked her why she thought it was okay to hire an outside joiner. When she explained it to him, he then went off to have a little talk with the manager, presumably about the economics of turning down work. The next thing we knew, we were informed that Murray had a Norsand joiner working on his own boat, and that joiner was now to be almost exclusively at our service until the work was done. We were glad something we had been asking for for weeks was finally going to get started, while at the same time feeling bad about inadvertently getting anyone in trouble, and somewhat frustrated that this obvious solution hadn't been made available earlier.

When the expert arrived, Maryanne walked Marray's guy through her ideas on the project. Joinery in boats can be complicated because boats have few straight lines. Thus, each individual plank of each set of shelves has to be shaped to the curved hull behind. Even corresponding shelves on the opposite hull aren't exactly mirror images of one another, so each piece of wood needs to be custom cut for its specific location. This is one of the reasons we wanted a professional instead of trusting the job to ourselves. We just didn't think we had the time, amid all our other jobs, to be learning a new skill to do a job we hadn't budgeted our own time for in the first place (plus needing the right tools for the job!). Murray's guy has been doing marine joinery forever. He's even built whole boats from scratch. We were really looking forward to watching a seasoned expert at work, like we had come to do every time Premek showed up.

Alas, it was not to be. The guy was cordial enough, and he had some really nice tools, but he really seemed to be struggling to make a pattern of the curved wall for the shelves in our berth. After spending a whole day of trial and error and coming to what looked to Maryanne and I like being pretty close to the final result, he would scrap the whole thing. Then he would start all over from scratch using a completely different method. After doing this for a full day (his original estimate for the time to do the whole boat was a week), he seemed no closer to cutting an actual piece of shelving than when he had started. There goes that taxi meter again. Maryanne couldn't take it anymore and wanted to call it quits. The yard manager politely explained to her that this sort of work is not as easy as it looks and to please be patient. They finally agreed to the compromise of giving the guy one more day to see what progress is made on the shelves in our berth, and then we could reassess regarding the rest of the boat.

He did finish (kinda). The shelves looked okay. Not great, but okay. Looking at them, it was hard for us to feel like this is what a fifteen-hundred-dollar set of shelves should look like. The material used wasn't really that good, there one of the shelved didn't yet sit on its supports, and it needed some epoxy work to secure it properly to the wall (and treatment/painting of course). We decided that was as far as we were going to go with that task as far as the yard was concerned. Murray can have his guy back now. We didn't like the pace of the work, the quality of materials chosen, and the large gaps where the wood wasn't properly patterned to the walls, certainly not for the cost.


We hadn't expected that just ONE set of shelves, would take so long and still be only partially finished,

Knowing that our choice was to either to give up or do the joinery ourselves, Maryanne started reaching out.

We'd recently been visited by Lynda and her husband Jeff. Lynda is one of the three actual employees at our beloved resource Noonsite.com, and when she knew we were going to be visiting New Zealand again reached out to us so we could meet up. She came and took us out for coffee and cakes (a much appreciated break from the yard) and brought along her husband Jeff who was very generous with all sorts of support and tips on our projects. He was keen to help (but based way too far away), but with a few extra tools and some youtube videos we could probably do the shelving outselves; the difficult part would be finding a table saw to cut the wood from the giant sheets purchased; that we couldn't do.


Lynda, a sub-editor of the website Noonsite (beloved by all cruising sailors), visited us in the yard and treated us to coffee and cake. Here we are with Lynda, and with Bruce (another international cruiser in the boat yard at the same time)

As it happened, Maryanne and I were about to take a break from the yard and go visit some friends in New Zealand. Neither of us felt like we could possibly fit in the time from the relentless pressure of our haulout list, but I opined that we were not going to sail all the way to New Zealand and NOT visit friends we haven't seen for years and may not see again for many more. If we need to stay hauled out for another week to do so, so be it. She agreed, and we both worked like sled dogs to get to a logical pause point in the list.

Two of those friends were Nic and Caitlin, formerly of Mahana, but now living in a lovely beach community at the opposite end of North Island. Nic is a carpenter for the movie industry who has spent a whole career building unusual things which will end up being the only one ever made. Nic seemed like the perfect guy to ask for advice. (Later, out from under the weight of hundreds of jobs, I realized the other perfect guy to ask would have been my own brother, Darren. Darren is a luthier. Everything he builds is curved. Sorry, Darren). Nic told us to take all the measurements we can and load our rental car with anything we think might be relevant/useful. He'll see what he can do when we get to his house, and thus his workshop.


Norsand Boat Yard >> On google maps

Tip: We found this youtube video by "Boating with the Baileys" a HUGE help in dismantling and rebuilding our Lofrans Cayman 88 Windlass. The manufacturer offers no instructions, just a parts diagram - not even explaing what needs greasing/oiling nor what sequence things need to be done, we'd have been lost without the help of the Baileys!

Thursday, July 29, 2021

Boat Yard - Noooooooooooo!

[Kyle]Well, we couldn't put it off any longer. The time for our planned haul-out, which had just become a much bigger animal, was fast approaching. Upon arriving at The Boat Works, the first thing we did was tie up to one of their floating slips for a night. This gave us the chance to start scoping out the various tradespeople we would need (known in Australia as “tradies”, of course). We also had organized both a surveyor and the trave-lift operator to come and inspect Begonia to see if our bulkhead damage would be an issue with the lift. Both agreed that the damage was minor enough not to be a factor (whew!). We had some engine guys come out so that we could get a jump on any necessary part orders and had a steel guy come to talk to us about both our steering and bimini issues. As a bonus, he ground some of the damage from our rudder posts which would have kept them from being unshipped for repairs.

Our water system was down to its last few liters, so we needed to add some. I don't generally like being unnecessarily heavy for a haul-out, so we normally only take on what we think we will need, plus a small reserve. Since we had no idea how long we would be out of the water and since the hose water at the hardstands is non-potable, I decided to fill both tanks, which comes to 512kilos (1,126lbs).



Haul out means the work begins FULL-ON
We don't want to be a day longer in the yard than we really need

Boat yards are always a miserable place to be. They are grubby and noisy and by design are that part of boating that is no fun at all. To their credit, The Boat Works seems to understand this and, while not being able to change the underlying purpose of the facility, do seem to go to a lot of effort to mitigate much of the discomfort. Our hardstand was on clean concrete, which minimized the grubby footprints problem significantly. Every boat also gets a proper set of hefty metal stairs for boarding, complete with a handrail. This seems like a small thing, but when you are carrying heavy stuff up and down all day, it sure beats using an old ladder you found in the lumber pile in the corner of the yard. There are also covered benches (seats) and workbenches behind the boats with vises where you can dismantle and pry at things out of either the glare of the sun or the pouring rain. They even put in a few trees to make it seem just a little less industrial. It's still necessary to hike to the facilities every time you need to go, but their toilet/shower rooms are all private, which surely beat army barracks-style. Best of all, they have free laundry and courtesy cars on the chuck-some-gas-in-it honor system.

The whole compound has almost every type of tradie a boatie could need, plus two restaurants and even a new barber shop. Since we had so very much work to be done and on so many different areas of the boat, we hired a small shipping container, into which we could empty almost all of Begonia's contents. We even took the covers off of everything but the bed and main settee so the guts of the boat were all easily accessible at the same time.

Then we took a deep breath and the work started. There was SO much to be done. Our list of jobs, which was being managed by Maryanne, started at over three hundred items, with the various tradies being responsible for the half that required big tools or a separate workshop. Over the course of our time there, we added another hundred or so tasks as we discovered anything we didn't like during our deep dive into Begonia's systems. That knocked almost as many nice-to-have items off of the list, but in the end, Begonia received her most comprehensive refurbishment since we have had her, maybe even since she first left the factory. {Maryanne: Actually, we cancelled many of this year's haul-out plans to make way (time and money-wise) for the repairs needed after the Tweed Head Bar incident - so we have more still for next time!}

The tradies portion of our list was our first problem. Since the COVID pandemic has hit the world, international travel has really plummeted. Since Australia hasn't been hit too badly by the illness itself, a lot of Australians have decided to stay at home and enjoy their beautiful country along with us foreign visitors. It seems that a lot of them have usual vacation money burning holes in their pockets, so they are buying boats (and caravans and new cars and home extensions) at unprecedented rates. If they can't go to Bali this Spring, they'll buy a boat and go sailing this Spring.

This means that every single tradie in or near The Boat Works has more work than they could ever want. They have so much work, in fact, that it's hard for them to find the time at night to deal with correspondence and billing as well. Getting the attention of any tradie is like being a patient of the best surgeon in the state. If they tell you the only time they can see you is in the middle of your wedding, Telling them it's a bad time is not an option. You reschedule the wedding.

This is where Maryanne really shines. Maryanne's whole purpose in life while hauled-out is to tick things off of the list. Some of it, she does herself. Others become my jobs. A tradie who has ignored too many emails in a row can end up with her showing up at their shop and dragging them back to the boat with her while I toil away at my assigned task. After a while, they all got to know her as Manager of the project. Guys would show up, look over my shoulder and ask, “Where's Maryanne?” We dealt with so many tradies and saw so many different faces that it was hard to keep everybody straight. I often found myself looking over my own shoulder with the same question. When she arrived, my common refrain became, “Oh, thank God you are here!”, followed by something like, “This guy says he's here for something about the gelcoat” and a shrug. She would then take over, take the guy to the relevant part of the boat and start explaining what needs to be done to him while I went back to my previous task.

Almost all of the tradies we hired (seventeen different companies) did good work that was to a better standard than Maryanne or I would have managed, especially for technical stuff we don't do so often, or those things that require a couple of strong guys with way better tools than we can fit on the boat. They ran the range from showing up mostly when they said to reliably letting us down every time.

Our worst offender was the company who was fabricating our replacement davits. It took weeks to make it to the top of their list. When we did, it was at the end of the day. They quickly determined the job couldn't be done in a day, so they would come back tomorrow, which they didn't do for three more days. When we did finally start getting daily visits, it was always just before quittin' time. “We'll be back tomorrow”, repeat. Every time they showed up, they would spend ages grinding and welding and drilling as if they were engineering the job from scratch, then they would take everything to the shop to be modified. “See you tomorrow.” Show up at 3pm. Start from scratch – again. One fun moment was when they and another tradie company who was also less than punctual were required to be aboard Begonia at the same time, as both of their jobs required coordination with each other before moving on. Each one would wait five minutes, decide they are too busy to stay longer and then take off, not to be seen again for the rest of the day. That's fine, the other guy never showed up anyway. It took Maryanne days to get them standing on deck next to each other. By then, one had undone the other's work, so they had some stuff to hash out between them.

Then there was the guy who did almost zero work (known as fuck-all in British), who eventually had Maryanne do almost his entire job before marking it as his own and then having the temerity to bill us for it. Oh, the money was flying out fast. I felt like Oprah Winfrey, walking through the boat yard and yelling to all of the tradies, “You get a pool, and you get a pool, and YOU get a pool...” Ugh!


My personal favorite tradie was a guy named Tarik. One of the haul-out jobs we had originally planned to do before the Tweed Bar incident was to replace both sail drive diaphragms. It's a big job that requires unbolting the associated engines, among other things. The last time we tried to do the job in Whangarei, NZ before sailing to Chile, the mechanic there found a couple of bolts that were so tight, we were worried that they were seized. Digging them out and glassing in new threaded plates for them would have required way too much time. Since the diaphragms were in good condition, we decided to reassemble what was there and leave it for another haul-out. Now enough time had passed that we were going to need to suck it up and do the job no matter how long it took.

The thick rubber diaphragm and its slightly thinner companion, the backup diaphragm, are critical parts of the boat. They are essentially a section of the hulls which is flexible to allow for the vibration of the engine and drive. They do wear out, albeit slowly, and if one failed, the subsequent hole would be more than big enough to overwhelm every pump on the boat. The replacement job is not technically difficult, but since it is extremely important to do it right and since I have never done it before, we decided that it was one of those jobs that would be worth paying an experienced expert to do.

Well, sort of. When we got the estimate, Maryanne decided we should maybe just pay for one so I could see how it's done, then I could do the other. I wasn't so sure, but I agreed to remain open to the idea until I saw it done.

So, when the day arrived at only slightly later than the appointed time, I readied myself to squeeze into the starboard engine compartment with a couple of beer-bellied, middle-aged guys to see how it was done. Who showed up instead was Tarik, who is exactly half as many guys, and he looked to be about half the expected age, and with no beer-belly to be seen. Where are my grizzled old experts? This is the kid they send to make and then subsequently patch an eight-inch hole in the boat? He even arrived on a bicycle.

Once he got into the engine compartment, he sure looked like he knew what he was doing. That must be extra hard with the owner hovering about, watching your every move. I peppered him with questions, to most of which I already knew the answers. He nailed every one and taught me a bunch of stuff I didn't know. Then, like a good and patient teacher, he walked me through the whole process, making sure I understood each step before moving on. He focused especially about what to do at various trouble spots and was full of good tips gleaned from his experience, like stick a 2x4 under the engine to take the weight so it doesn't fall over when the sail drive is disconnected. Then, with nary a grunt, he picked up the 40kg (88lb) drive assembly and wiggled it around until the big end at the prop shaft came through the hole, then set it down next to me.

”THAT'S EASY!!!”, I shouted, quoting Michael Palin's line as Sir Galahad in “Monty Python and the Holy Grail”. I realized on the last syllable that this movie came out WAY before Tarik was even born, so there was a chance he may miss the reference. If he did, he didn't let on. He said he would take the drive to the shop and disassemble it after lunch.

Okay, the job will take a little longer with our tools, but I'm confident I can do it now. Then Maryanne won the day by asking Tarik if he wouldn't mind letting me use his tools while he was at lunch. Now, you've got to understand, tools are a mechanic's livelihood and most have to buy their own. It was clear that Tarik was spending a good portion of his pay on top-quality tools. Without hesitation, he said, “No problem. Bring them to the shop when you are done.” and left $1,000 worth of tools behind for me to use. I had been planning on tackling the port sail drive soon, but not necessarily today. Now I had to do as much as I could during lunch!

Thirty minutes later, I arrived at the shop with not only the returned tools, but also part of the port drive that I couldn't get apart. The rest was on the workbench behind Begonia. Tarik's big impact driver made short work of the bolts that had worried us in Whangarei. They came out clean, but really hot!

Using the starboard drive as an example, Tarik walked me through disassembly and removal of the prop shaft. It looked easy enough, but I just couldn't get the shaft and its associated gear out of the drive housing. Both parts are machined to very high tolerances and getting them misaligned with each other while trying to slide them apart can actually jam them together. I've had the same problem on the top end before, but have always been able to resolve it. I figured a more experienced hand would know better how to finesse the part free.

Tarik tried and got stuck in the same spot. Maybe it wasn't me after all. Then his boss, Rob, put the whole drive in a big vise and started whacking it with a big sledgehammer. Oh, I can't bear to watch!

When the thing finally came free, Rob took a look inside the housing and said, “There's your problem.” He pointed to a little miniature wave of aluminum that had been shaved out of the housing by the outside of the adjacent gear, blocking it from being removed. As soon as I saw it, I knew what it was. Back in Mexico in 2017, our transmission had failed when the internal pin connecting the shift lever and the actual gears sheared. I retrieved most of it, but at the time there was one small piece that I couldn't find. It was now gone, probably with the oil on one of the subsequent oil changes, but at some point, it had bounced its way through the oil galleries to that gear where it scoured that little wave. We were very lucky. Had it jammed between gears instead, it would have seized the whole drive, causing all sorts of expensive damage to both it and the engine. Maryanne and I decided to leave the port drive with Rob and Tarik to inspect and repair as necessary. So much for our savings from only having them do the one side.

I picked up both newly refurbished drives a week and a half later and took them back to Begonia for painting. After a couple of coats, Tarik said he would be over the next morning to install the starboard one. Again, I wasn't planning on doing “my” side just yet, but I wanted to beat him to it, so I rearranged my jobs list to do it first thing. I managed to have the whole drive installed and connected to the engine before he showed up. Tarik did his side in half the time it took me, and then was nice enough to inspect my work while I looked at his. It looked the same to me. He reported the same and we both agreed they were both properly done jobs. He still had a few more minor things to do, but the big task was done. At one of these subsequent visits, we learned that our engine guru was not in fact in his twenties, he's really eighteen. Eighteen! You'd never know it by watching him work.

As a Thank You, we gave him a couple of gift certificates at the place in the yard where Maryanne and I buy our lunches when we are too busy to make our own, which is most days. We later learned that instead of feeding himself with them, he was using them to buy coffees for the guys at work.

The worst of our jobs was one I really wanted to farm out, but we just didn't have the budget for. We needed to replace all of Begonia's sanitation hoses. This is a job that was honestly overdue when we bought the boat, but kept getting pushed back because neither of has us wanted to face it. Now, since we were basically dismantling the empty boat anyway and going to be in the yard for a while, we knew there would be no better time to do it.

Sanitation hose is designed to be pretty impermeable. As such, it's stiff and heavy and difficult to work with. Begonia has over 17 meters (~50 feet) of the stuff snaking its way through hard-to-get-to spaces not unlike her own, uh, digestive tract. We had to deal with two sets of it.

First was removal of the old stuff. Since it had spent decades in its particular orientation, whatever pliability it may once have had was long gone. We quickly learned that the only way we were going to get it out was by cutting it in pieces to do so. Oh, horror! Fortunately, the inside of almost all of it was dry, so we only had to cringe at the scale flaking off and pouring out of the ends as dust.

Of course, once you've breached a hose you're committed to the entire job. There is no way that wrapping six layers of duct tape on the thing and putting it back is ever going to be acceptable. Also, once you've breached a hose, you can't sit anywhere or touch anything without first taking two showers and then changing clothes.

I wouldn't have thought so before starting the job, but the worst part ended up being getting the new hose installed. Unlike the old stuff, you can't cut it to make it easier to pass around a corner or through a bulkhead. The whole thing has to be fed the whole way. It comes from the factory coiled in loops about a meter in diameter and it fights like hell to spring back into the same shape if you try to do anything else with it. In some places, it took all of both of our strength to simultaneously bend and shove and pull the hose into position. Gyms have those giant ropes you're supposed to pump up and down. They need a sanitation hose station where the goal is to feed a long hose through a maze.

As the job wore on, our strength flagged, but the hose was as resistant as ever. We woke up more and more sore every morning. Then came the fun next part. For obvious reasons, the hoses are meant to fit onto the flanges at each end with such a tight fit that the ends first have to be heated and then pushed on with the aforementioned effort. When it finally came time to tighten the hose clamps, neither of us had the strength left to grip a screwdriver.

That was a job that is good to have in the rear view mirror. Hopefully, we don't even have to give any of that system a thought for at least another decade. We probably saved ourselves four thousand dollars in labor costs by doing it ourselves, but now we know for sure that next time, we'll be happy to fork over the dough.

Another big job we had was replacing our steering interconnect tube. This long tube runs between the port and starboard rudders to keep them aligned and is the connection point with all of the rest of the steering system hardware. It runs almost the entire width of Begonia and can only be removed or installed through the side of the boat through the ventilation system. The tube is so long that it couldn't be removed if the boat next to us was too close. We were lucky that the boat on our port side was a smallish monohull that allowed us to just clear their stern by bending the tube as much as we dared. We were worried the replacement tube wouldn't arrive until after they were gone and something bigger would be blocking the access. We got the new one in the day before they left.

That was an interesting boat neighbour. It was regularly visited by a dozen people at a time, who would stay for an hour or two and then all leave en masse. The weird thing was that there was never more than one or two of them who were actually doing anything. The rest stood by, scratching their chins and muttering to each other. Perhaps it was a bunch of Naval Architecture students on a field trip? Any time one of us tried to make conversation, we were either ignored completely or given super-vague answers like, “It's a special boat”. The cat finally escaped from the bag (they never “let” it out) when it was wrapped.

Instead of painting a boat's topsides, like in the olden days, these days a boat has as an option to be wrapped with a heat-shrink plastic covering. The process takes only a day and can completely transform a boat. We came home from the hardware store one afternoon and found that the dingy white boat next to us had turned bright pink. Ah, hah! Neither of us knew the back story, but we both instantly knew what was going on: This boat was being set up as a replica of Jessica Watson's boat, Ella's Pink Lady, on which she had circumnavigated as a teenager. We've read her book. Now it looked like someone was getting ready to make the movie.


Our Film-star neighbour had regular fancy visitors
The Pink Lady getting ready for its movie role

A quick google brought up the story about how Netflix is gearing up for the project. Well, there you go. That also explained so many other things, like why they built a dodger out of plywood and why they put the bottom paint on over the old growth without any prep whatsoever. Late in one of our projects, when I was trying to figure out how to wrestle our main beam back into place, the crowd paid the boat a visit. One of them, bored with watching the one guy do the work, started chatting to me about our project and what we have been up to. Then the conversation shifted to the pink boat. I said it was pretty obvious what was going on now and he broke out of the cone of silence long enough to tell me the boat was going to be used as a set and placed in a tank they were building. The boat would be connected to a hydraulic ram system like the ones used for flight simulators so that it could be thrown around for the action scenes. They didn't need to worry about bottom growth and the dodger didn't need to be able to withstand actual ocean waves.

One curious and obvious change was the name. Jessica Watson's boat clearly said “Ella's Pink Lady” in big, white letters on the side, after her main sponsor. The new boat just said “Pink”. We thought they were just not finished yet, but that's how they launched it later. Perhaps Netflix was not going to give them free advertising or perhaps they didn't want to pay for more. I guess we'll see when the movie comes out.

We had a couple of injuries. Just as we were in the middle of offloading Begonia's contents into the container below, my back went out. Ironically, I felt the big 'pop' as I was in the middle of the physical therapy exercises I do every morning to prevent such a thing. We were able to rearrange the job list to make it easier for me for a few days, but there was nothing we could really do about the long walk to the toilet block. During the worst of it, I was hunched over at a thirty-degree angle and had to stop several times to rest each way.

Maryanne was working beneath the bridge-deck when she hit her head really hard on the dangling anchor. What she didn't notice at the time was that she also bumped her eyebrow. The next morning, when we woke up, I took my first look at her and was shocked to see that she had a black eye. It wasn't minor, either. A wide ring of burgundy surrounded her whole left eye. It got even worse over the next couple of days. We were getting pretty worried about it until a doctor friend of ours explained that it was something called “sympathetic bleeding”. Apparently, if you bust a blood vessel in your eyebrow, that's where the blood goes.


Kyle's back didn't cooperate with the schedule, and Maryanne got a black eye after slamming her head into the anchor

Our time wasn't all work. We quickly learned that the local pub, the Boathouse, has a quiz night every Wednesday night. That was something to look forward to and a nice excuse to knock off an hour or so earlier than usual one day a week. At first, it was just the two of us, but by the time our haul-out was done, we were filling the big table right up front with boaties looking for a break.

About a month in, we finally got to where we had a few areas of Begonia that no longer required full access. That meant we could start transferring the contents of our shipping container back into the boat where it is supposed to live. It gave us a chance to take a good, hard look at each item to review its utility. We managed to lose a few kilos.


Slowly the jobs get completed, and the container is emptied

Outstanding work kept us from emptying the container in one go, but it was nice to see the top of the pile shrink from the ceiling to knee level over the next few weeks. Eventually, enough of the work was done that our main task for the following few days was to empty it completely and get everything back aboard Begonia and stowed in its proper place.

We were doing pretty well until the last day. Begonia was clean and organized inside and there were only a few scattered things left on the container floor. Maryanne had to make an urgent run to the hardware store. By then, it was getting late enough that I decided to just get it all aboard, stuff it where I can and worry about stowing it tomorrow.

The next day, a bunch of stuff came up that needed to be done right away. Stowing would have to wait, but I also had to dig out a bunch of tools and parts, so Begonia became even more of a mess.

My plan to rectify that the next tomorrow was foiled by the weather forecast. Rain was coming, but first, we would have one nice day. That meant that all of the outside work we had planned to do over the next two days had to be completed in one. We finished exhausted and the inside of the boat was such a jumbled mess that we couldn't take a step or sit down without landing on an old part or a pair of pliers.

We were never going to make it. It was Friday, Day 47, and we were finally scheduled to go back in the water on Monday morning. Maryanne had been trying so hard to institute a policy of taking a day each weekend to go into the mountains for something she called “fun”, whatever that is. So far, we had managed a Sunday afternoon at Tamborine Mountain, along with everybody else from Brisbane, two weeks earlier. The next weekend had the only good weather to finish a couple of critical jobs, so that had to be scrubbed. This meant that she really, really, REALLY wanted to go away for our last whole weekend. That meant that by Friday night, all of the outstanding jobs had to be completely done and Begonia had to be clean and shipshape, since there would be no time on Monday morning.

We just made it. Well after dark, we finally got Begonia looking better than she has the whole time we have owned her, but we were both so tired that neither one of us could hardly care. We cracked open a couple of celebratory beers, but struggled to stay awake long enough to finish them.

We ended our weekend get-away returning to Begonia carrying boxes from our favorite local pizza place (so we didn't have to dirty any dishes). Tomorrow, we would finally be going back in the water. Neither one of us could really bring ourselves to believe it and we both slept fitfully with worries about some last-minute thing that was going to crop up and require us to stay out for another two weeks.

In the morning, the travelift arrived, picked Begonia up and then the crew left for lunch (so we could apply antifouling paint to the areas on which she had been resting). We got deja vu from when they lifted us to install the rudders, put us back down and then left us for weeks without taking us along. Then the big tires started rolling and we knew we really were leaving this time.

We still weren't done with all of our jobs. Tarik joined us so that he could get started with a coolant flush on both engines. He asked Maryanne for a jug of water to mix with the solution he had. She pumped about a liter at the sink and then the tank ran dry. We had just made it. I was glad we topped up before hauling out. Once we got to a dock, we filled the tanks again and I spent most of the rest of the day power washing the last remnants of the yard grime away.

Poor Tarik. His boss had told him that the easiest way to drain the cooling system was to let it drain into the bilge and then pump it all out into a container at the end of the job. The rising coolant set off our bilge alarm, which is loud with a high, piercing tone. I heard it from outside, but just thought it was somebody nearby about to start an engine. When the noise didn't go away, I started walking around trying to find the source of the noise. Eventually, I realized it was coming from inside our boat and continued the search there. I finally found Tarik in our berth (which is also the port engine compartment). The noise was echoing around the small space and was SO loud. He couldn't find the actual source of the sound, so he was trying his best to pretend it wasn't acting like a vise on his skull. When I removed the battery, he was relieved, but said the ringing hadn't stopped.


And finally we are returned to the water

Our new slip was only two hundred meters to the west of the pad that we had we occupied for seven weeks. It was sooooo much nicer to be in the water. The intervening work sheds were now facing away from us, which directed the sound from us instead of at us. The Boat Works had also thoughtfully left in a barrier of big trees along the shoreline, which broke up the remaining noise. The main sounds we could hear, when some moron wasn't power washing his deck, was the songs of the various chirpy birds in the trees. It was very peaceful. It was actually an ideal environment for what came next.

Not one, but TWO podcasters had said that they wanted to interview us. The first, Linda Woods of Yachting Yarns, had seen us on the news. When she heard we had been living aboard for nineteen years, she thought we might make for an intriguing episode. She has a background in television and had just started podcasting. She was not a sailor, but thought some of their stories made an interesting theme. She asked about the Tweed Heads thing, but mostly the show was an hour or so long narrative of our Footprint years. I don't think it was planned that way. That's just when we started to run out of time. We did the interview over the phone while seated in Begonia's salon.


Podcasting in the temporary studio aboard Silver Fern

Next up was David Hows with his podcast, Ocean Sailing . That one is apparently the second most downloaded sailing podcast in the world. We met him when he came over to buy some surplus stuff we were trying to keep from transferring from the container back aboard. He also wanted to interview us in person aboard Begonia, but once he found out we probably didn't have enough 230V Australian electricity (The only alternating current we have aboard is via a portable 120V US inverter), he changed the venue to his boat, Silver Fern, which is giant, beautiful, and well-equipped. He had a whole portable studio set up in the salon, complete with a big, fluffy mic each. We talked for well over an hour, focusing mainly on how we got started in the first place and how we managed to take the leap between good jobs and world sailing, with a few stories thrown in. Despite the fact that he speaks to lots of sailors who are top in their niches, he treated us like he thought we had something really interesting to say.

Just as we were getting ready to leave for our final quiz night, Linda called us back. While looking for some pictures to include in the show link, she noticed that we had been through Hurricane Sandy and wanted us to do an impromptu update on what that was like. She said we will probably end up with two episodes.

Once we had slept in a little, we finally left the next morning for somewhere that wasn't The Boat Works. We only went the six miles or so back to Paradise Point, where we anchored before the whole refit started. Maryanne was so good. Despite wanting to get off of the boat and go ashore, she let me do what I wanted, which was a whole lotta nuttin'. We slept in, watched a movie, ate a big meal and then went back to bed early. I got a little bored and was thinking of doing one of the easy remaining jobs, but I decided that violated the principal of a feet-up day (as our friend Nick would say), so I just didn't. It was hard to get out of the habit of always being busy, but it was just what we needed and long overdue at that.

[Maryanne] Seven weeks in a boat yard is a record for us, and one we never hope to need again. Most of the time was not really due the amount of work, but delays with parts, and with tradespeople. We only took three days off during that whole time. The whole experience was exhausting and frustrating, and we are so glad to have the boat (our home) back in the water where she belongs. Now we can look forward to some more cruising time ahead, back to doing what we are here for, and are keen to head north to warmer waters as soon as possible.

So what did we achieve? Most of the work was related to damage repairs, with some routine maintenance and a couple of upgrades. Here is a sample of the works

  • Repairs
    • Repair/Reinstall binini frame (the bimini is the shade awning for the cockpit)
    • Repair bimini canvas
    • Clean up Battery compartment - replace solar controllers, redo wiring
    • Replace Chartplotter
    • Remove/replace beam and fix cracks around beam mounts
    • Repair dinghy davits
    • Replace steering pole, sheaves, etc damaged in incident
    • Replace autopilot unit
    • Fix cracks in bulkhead
    • Fix leaks in several hatch/deck seals and hatch/glass seals
    • Fix leaks in cabin windows
    • Repair Rudders and rudder posts
    • Remove/fix/replace eye-brow (which gives shade over cabin windows)
    • Engine repairs - mounts, etc...
    • Repair dingy punctures (poly weld)
    • Sail Inspection/Repairs
    • Mainsail track repairs
    • Fix/Service feathering propellers
    • Fix bedroom light wiring - causing intermittent failure.
    • Fix Wind generator wiring issue causing over voltage errors
    • Inspect/repairs to bows (strange rust spots)
    • Remove and re-bed galley sinks
    • Remove and re-bed deck hardware that was causing leaks
    • Cockpit sliding door track - replace missing guide strips
    • Replace Eno Stove burners
    • Repaint trim on cockpit window
    • Fix various gelcoat dings and cracks on deck
    • Fabricate new window covers
    • Remove/clean/replace anchor strike plates (that stop the anchor hitting the gelcoat)
    • Replace catches on all the portholes aboard (plastic was degrading and seal not holding)
    • Replace vent to battery compartment
    • Sand/Repaint dinghy mast
    • Fix up sewing machine
    • Repair/Reinstall shower doors
  • Maintenance
    • New Batteries - no problems with the old ones, but it's coming due
    • Rigging inspection / adjustments
    • All new sanitation hose
    • Reverse anchor chain (to help extend life)
    • Prep and apply anti-foul bottom paint
    • Polish and wax hulls
    • Engine and saildrive maintenance
    • Fridge compressor check / wiring rerun
    • Paint internal walls (hulls and berths)
    • Service Windlass (helps pull up anchor chain)
    • Service all winches
    • Inspect/service through-hulls
    • Inspect/service Webasto heater
    • Clean water tank sight tubes
    • Make new dinghy slings (Webbing)
    • Repaint forward bow compartments (Bilge paint)
    • Sand/Varnish hallway skirting boards
    • Replace shower/bilge pumps (working, but about time)
    • Change out water tank valves for easier ones.
    • Replace speedwheel so we have a working water temperature sensor
  • Upgrades
    • New Double helm seat (including supports and cover)
    • Change cabin lights for touch-sensitive on-dim-off versions
    • Installed wheels on our dinghy to (hopefully) make taking it ashore a little easier
    • Installed a gas strut on top loading fridge door
    • Replace handles on butcher block/sink cover

A lot of the effort was removing and replacing things to gain access for other work, and we also had to replace all the items that were washed overboard, or were ruined from the seawater that found itself inside (we had a LOT of parcel deliveries to the Boat Works). Additionally we managed a trip to the dentist and skin cancer checks (all clear), and submitted another visa extension application so we can (hopefully) stay in Australia a little longer.

Sunday, March 25, 2018

Stuff Gets Fixed

[Kyle]On the first clear day after getting home with spare parts in my suitcase(s), my first main job was to repair the starboard shroud. Even though I had run lines to take the load off and the shroud was sagging, it was still a little disconcerting to go up the mast and disconnect the top end while I was up there. As I was doing that, the wind picked up and it got a little choppy in the river. The polyester lines that were supporting the mast on the starboard side stretch more than the steel cable does, so the mast started swinging slightly while I was swinging from it, which made the situation seem much less secure than it was.

{Maryanne: The problem 'shroud' is one of the 3 critical wire supports that hold up the mast, quite important! To do this fix, Kyle had to climb up the mast and disconnect it - but only after rigging a bunch of other stuff that would hold up the mast in the meantime! Once it was disconnected he could trim it back to 'good wire' and then install the new parts. We were very lucky in that our neighbours aboard Sea Rover II had recently done the same fix and gave a few excellent tips and a heap of confidence. This along with the advice from our US rigger gave us (Kyle) a lot of moral and mental support for the job (which turned out to be quite straightforward - thankfully).}

When I got back down, It was time to cut the shroud to the right length with a hacksaw. This to me causes the same feeling as drilling a hole through the boat. I don't like it and I try to avoid it at any cost. It needed doing, though, so I reviewed the repair procedure several times and made triple sure I didn't screw up the cut and ruin the shroud.

Maryanne helped me assemble the terminal and we're both pretty happy that it is stronger than the one on the port side now.

I went back up and reattached it. I was worried something terrible would happen, like it would be mysteriously too short, but it fit just perfectly. I was still being thrown around by the chop and it was a huge relief to get the mast hooked back up to its designed support mechanism.

It took another hour or so to re-tension and re-tune the rig, making sure the mast was perfectly straight and centered. Maryanne said, "Great! Now we can go sailing. We just can't anchor." She has a way...

So, the next day, I replaced the windlass.

Putting the thing in place was easy because it was the same model as the old one and the blots fit through the old holes. The tricky bit was the wiring. The wires are big, carry a lot of current and live in the anchor locker, which means they're almost constantly wet with salt water. It was important to slow down and be very meticulous about going through all of the steps to make proper bulletproof (waterproof!) connections and make sure they were thoroughly sealed. It runs beautifully and looks so shiny that it will seem like such a shame to use it and get it all scratched and muddy. I wonder what the chances are of getting Maryanne to do it by hand for a while...

The rest of the jobs that arrived in our luggage were minor and we were able to squeeze them in between the bigger ones. Now we're all fixed up again and ready to go somewhere AND anchor.


Kyle fixes the shroud and the new windlass